S4HANA & GTS hubSAP knowledge hub

QM · Quality Management

Inspect-to-Release SAP S/4HANA training

Control inspection lots from creation through result recording, usage decision and stock posting.

Process overview and business context

Inspect-to-Release ensures that materials and production outputs meet quality requirements before unrestricted use or customer delivery.

Learners can explain inspection lot creation, results recording, defects, usage decision and follow-up stock postings.

End-to-end flow

  1. 1

    Create inspection lot

    QA01 / Automatic

    Fiori app: Manage Inspection Lots

    ACDOCA impact: No finance posting; controls quality stock.

  2. 2

    Record results

    QE51N

    Fiori app: Record Inspection Results

    ACDOCA impact: Captures measured values and acceptance.

  3. 3

    Record defects

    QM01

    Fiori app: Manage Quality Notifications

    ACDOCA impact: Documents nonconformance and follow-up tasks.

  4. 4

    Make usage decision

    QA11

    Fiori app: Make Usage Decision

    ACDOCA impact: Releases or blocks quantity and can trigger stock posting.

  5. 5

    Post follow-up action

    QA11 / MIGO

    Fiori app: Stock Posting

    ACDOCA impact: Moves stock to unrestricted, blocked, scrap or return flow.

Key tables

TableExplanation
QALSInspection lot header data.
QAMVInspection characteristics and specification data.
QAMRRecorded inspection results.
QMELQuality notification data for defects and complaints.
MSEG / MATDOCInventory postings following usage decision.

Step-by-step walkthrough

Check lot origin

Confirm whether the lot came from goods receipt, production, delivery or manual creation.

Watch out for: Different origins drive different stock and process effects.

Record complete results

Enter required characteristics, samples and valuation before decision.

Watch out for: Incomplete results can block usage decision.

Use defects for learning

Create notifications when failure needs root-cause action.

Watch out for: Skipping defect data hides supplier or production trends.

Decide and post stock

Make usage decision and confirm stock posting proposal.

Watch out for: Usage decision is a controlled quality release, not just a click.

Common errors and troubleshooting

Usage decision is blocked

Likely cause: Required characteristics are incomplete or rejected.

Fix path: Review result recording and characteristic status.

Stock does not move after decision

Likely cause: Stock posting proposal was not accepted or posting failed.

Fix path: Check UD stock tab and material document log.

Inspection lot not created

Likely cause: Inspection setup in material master or procurement/production trigger is missing.

Fix path: Check QM view and inspection type activation.

ECC to S/4HANA differences

S/4HANA keeps the inspection-lot lifecycle but improves role-based processing, analytics and integration with purchasing, production and inventory.

Glossary

Inspection lot
Quality object that groups inspection requirements and quantities.
Characteristic
Measured or evaluated quality requirement.
Usage decision
Final decision that accepts, rejects or routes inspected quantity.
Quality notification
Record for defect, complaint or corrective action.

Knowledge check

Complete the quiz with at least 70% to unlock the certificate.

Start the generator