S4HANA & GTS hubSAP knowledge hub

QM · Quality Management

Inspect-to-Release SAP S/4HANA training

Control inspection lots from creation through result recording, usage decision and stock posting.

Vue du processus et contexte metier

Inspect-to-Release ensures that materials and production outputs meet quality requirements before unrestricted use or customer delivery.

Learners can explain inspection lot creation, results recording, defects, usage decision and follow-up stock postings.

Flux end-to-end

  1. 1

    Create inspection lot

    QA01 / Automatic

    App Fiori: Manage Inspection Lots

    Impact ACDOCA: No finance posting; controls quality stock.

  2. 2

    Record results

    QE51N

    App Fiori: Record Inspection Results

    Impact ACDOCA: Captures measured values and acceptance.

  3. 3

    Record defects

    QM01

    App Fiori: Manage Quality Notifications

    Impact ACDOCA: Documents nonconformance and follow-up tasks.

  4. 4

    Make usage decision

    QA11

    App Fiori: Make Usage Decision

    Impact ACDOCA: Releases or blocks quantity and can trigger stock posting.

  5. 5

    Post follow-up action

    QA11 / MIGO

    App Fiori: Stock Posting

    Impact ACDOCA: Moves stock to unrestricted, blocked, scrap or return flow.

Tables cles

TableExplication
QALSInspection lot header data.
QAMVInspection characteristics and specification data.
QAMRRecorded inspection results.
QMELQuality notification data for defects and complaints.
MSEG / MATDOCInventory postings following usage decision.

Parcours etape par etape

Check lot origin

Confirm whether the lot came from goods receipt, production, delivery or manual creation.

A surveiller: Different origins drive different stock and process effects.

Record complete results

Enter required characteristics, samples and valuation before decision.

A surveiller: Incomplete results can block usage decision.

Use defects for learning

Create notifications when failure needs root-cause action.

A surveiller: Skipping defect data hides supplier or production trends.

Decide and post stock

Make usage decision and confirm stock posting proposal.

A surveiller: Usage decision is a controlled quality release, not just a click.

Erreurs courantes et resolution

Usage decision is blocked

Cause probable: Required characteristics are incomplete or rejected.

Chemin de correction: Review result recording and characteristic status.

Stock does not move after decision

Cause probable: Stock posting proposal was not accepted or posting failed.

Chemin de correction: Check UD stock tab and material document log.

Inspection lot not created

Cause probable: Inspection setup in material master or procurement/production trigger is missing.

Chemin de correction: Check QM view and inspection type activation.

Differences ECC vers S/4HANA

S/4HANA keeps the inspection-lot lifecycle but improves role-based processing, analytics and integration with purchasing, production and inventory.

Glossaire

Inspection lot
Quality object that groups inspection requirements and quantities.
Characteristic
Measured or evaluated quality requirement.
Usage decision
Final decision that accepts, rejects or routes inspected quantity.
Quality notification
Record for defect, complaint or corrective action.

Test de connaissances

Obtenez au moins 70 % pour débloquer le certificat.

Lancer le générateur