PP · Production Planning

Plan-to-Produce SAP S/4HANA training

Convert demand into planned orders, production orders, confirmations and goods receipt.

Vue du processus et contexte metier

Plan-to-Produce turns demand into executable production. It depends on material master data, BOMs, routings, work centers, MRP, capacity and shop-floor confirmations.

Learners can explain how MRP proposals become production orders and how confirmations and goods receipts affect inventory and finance.

Flux end-to-end

  1. 1

    Capture demand

    MD61 / Sales order

    App Fiori: Manage PIRs; Monitor Demand

    Impact ACDOCA: No direct posting; creates planning requirement.

  2. 2

    Run MRP

    MD01N

    App Fiori: Schedule MRP Runs

    Impact ACDOCA: Creates planned orders or purchase proposals.

  3. 3

    Convert planned order

    MD04 / CO40

    App Fiori: Manage Planned Orders

    Impact ACDOCA: Creates production order with BOM and routing.

  4. 4

    Confirm production

    CO11N

    App Fiori: Confirm Production Operation

    Impact ACDOCA: Posts activity and can trigger backflush.

  5. 5

    Post goods receipt

    MIGO / CO15

    App Fiori: Post Goods Movement

    Impact ACDOCA: Updates stock and financial inventory value.

Tables cles

TableExplication
MARA / MARCMaterial master and plant planning data.
STKO / STPOBill of material header and item data.
PLKO / PLPORouting header and operation data.
AFKO / AFPOProduction order header and item data.
RESBComponent reservations for production orders.

Parcours etape par etape

Review planning inputs

Validate MRP type, lot size, procurement type, BOM and routing before running MRP.

A surveiller: MRP cannot compensate for bad master data.

Convert the right proposal

Use stock/requirements list and exception messages before converting planned orders.

A surveiller: Do not convert every proposal without checking dates and quantities.

Control execution

Release order, stage components and confirm operations with realistic yield and scrap.

A surveiller: Backflush errors often reveal missing components or wrong BOM validity.

Close the order

Post goods receipt, analyze variances and settle where required.

A surveiller: Unsettled orders hide production cost issues.

Erreurs courantes et resolution

No planned order created

Cause probable: MRP views, planning file, lot size or demand source is missing.

Chemin de correction: Check MD04, material master MRP views and planning file entry.

Component not backflushed

Cause probable: BOM item, storage location or backflush indicator is wrong.

Chemin de correction: Inspect BOM item, work center and production supply settings.

Order variance is unexpected

Cause probable: Actual consumption, activity confirmation or standard cost differs from plan.

Chemin de correction: Analyze component issue, confirmations and costing data.

Differences ECC vers S/4HANA

S/4HANA improves planning and execution visibility with MRP Live, Fiori monitoring and real-time inventory/finance integration.

Glossaire

MRP
Material Requirements Planning calculation for supply proposals.
BOM
Bill of material listing components required to make a product.
Routing
Sequence of production operations and work centers.
Backflush
Automatic goods issue of components during confirmation.

Test de connaissances

Obtenez au moins 70 % pour débloquer le certificat.

Lancer le générateur